First Presbyterian Church
Building and Grounds Minutes
Mar 11, 2014
Dennis Thomas, our moderator, was out of town
and asked Steve Johnson to conduct the meeting. He opened the meeting at
about 7 PM. Additional members present were Bill Haynes, Ed Green and
Roger Sellers.
The playground fencing was discussed. The
fence is installed and problems with painting appear to have been resolved.
This project is about 95% complete at this time.
Both doors into the Choir room need repair.
The joints are coming apart. One replacement door is on hand at this time.
The East side door is the worst case and it will be done first.
There are problems with the sprinkler system
on the West side of the parking lot. Brian appears to have the skills and
items required to make repairs.
There is problem contacting the Brian from the
office. Ed Green is going to investigate some options which could solve this
problem. Some young friends of the Loman family are willing to work on the
garage. The stucco apparently needs painting. The building should be washed
before painting and members stated that only an Elastometric paint should be
used. It is expensive. Steve finished repairing the sanctuary light
but another one has since failed. There is no database available which
defines fixtures ballasts, bulbs, etc. This lack of a good database problem
occurs in many repair cases.